Lumut Port  
Search
 Go
Home
Berth Status
Lumut Port Industrial Park
LPIP Layout
LPIP Benefits and Value
Tenders and Job Vacancies
Useful Links
Web Site Map
Member Login
Why Register?Register with Us
Username:
Password:
Login Forgot your password?
Member Access
Cargo and Box Status Enquiry
Document Submission
Lumut Port
Corporate Information
Standing Offer
Facilities and Services
Lumut Maritime Terminal
Lekir Bulk Terminal
Photo Gallery
FAQ
Contact Us
Lumut Port News
Enter your email below to subscribe
Subscribe
Current Issue
Archives
Home > Facilities and Services  

Lekir Bulk Terminal

Nature of Terminal Common User Port designed to handle dry bulk and liquid bulk. Gazzetted Customs Port.
Port Operation Working Hours
3 shifts,
24 hours per day,
365 days per year.
Administrative Working Hours
Mondays to Fridays
08:30 am - 17:00 pm
Saturdays
08:30 am - 12:00 noon
Closed Sundays and Public Holidays
Navigable Channel
Directly off the Straits of Malacca
- minimum depth 20m at all times
Berths
South Berths
Length
530m
Draft
20m ACD
North Berths
Length
250m
Draft
18m ACD
Vessel/Size/
Parameters
Vessels/
maximum 180,000 DWT
Barges/
minimum 7,000 DWT
Services to Vessels
Tuggage required
Pilotage compulsory
Port Agency available
Container Facilities  
Dry Bulk Facilities Storage
Open storage area of 200,000 sq. metres that can be equipped with appropriate stacking and reclaiming equipment for integration into existing transfer station system. Estimated storage capacity up to 1.5 million MT.

This storage capability excludes the adjacent dedicated coalyard serving the adjacent power station.
 
Unloading Equipment
2 Grab shipunloaders with 1,500 mt/hour rated capacities feeding 2 import conveyors, with each conveyor having 3,800 MT/hour rated capacity (inclusive of provision for extra grab unloader in future), integrated with a transfer station system with alternative routing capability.
 
Direct Transhipment Capability
Direct transhipment at berth possible using existing unloaders for direct ship/barge to ship/barge transfer between north and south berths, with estimated transhipment capacity of between 500 MT - 700 MT/hour for each unloader (total 1,000 MT - 1,400MT/hour).
Ship Loading Capability
Provision for future export berth for vessels/barges with 15m ACD water alongside, with export conveyors integrated with existing transfer station system. Loading rate of 2,500 MT/hour contemplated.
 
Blending/Homogenisation Capability/Special Storage
Provision for future installation of a covered blending facility within a 15,000 sq. m. area of 60,000 MT capacity with in-bound and out-bound conveyors integrated with existing transfer station system, permitting shiploading or delivery to open storage yard for truck loading.
Screening/Washing Capability
Provision for future installation integrated with existing waste water treatment facilities.
Mobile Equipment
Wheel loaders, dozers, mobile feed/stacker, etc. to suit requirements.
Liquid Bulk Facilities Pipeline wayleaves and tank areas available for direct vessel-to-plant/tank transfer by negotiation.
Conventional Cargo Facilities  

back to top  

www.lumutport.com

Copyright 2003, 2004 Lumut Maritime Terminal Sdn Bhd. All rights reserved. Web Guru Asia developed this site.
Please read the Exclusion Clauses.